Propuesta de mejora para incrementar la disponibilidad de equipos Chiller, Bombas y Ventilación con RCM en Edificios Corporativos
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Authors
Rimache Inca, GerardoAdvisors
Montoya Ramírez, Manuel FernandoIssue Date
2025-10-27Keywords
Mantenimiento centrado en la confiabilidad (RCM)Disponibilidad operativa
Gestión de activos
Edificios corporativos Prime A/B
Reliability-centered maintenance (RCM)
Operational availability
Asset management
Prime A/B corporate buildings
Metadata
Show full item recordOther Titles
Improvement proposal to increase the availability of chiller, pump, and ventilation equipment with RCM in corporate buildingsAbstract
El presente trabajo de suficiencia profesional se enfoca en la aplicación de la metodología de Mantenimiento Centrado en la Confiabilidad (RCM) para mejorar la disponibilidad operativa de equipos eléctricos críticos —chillers, bombas contra incendio y sistemas de ventilación— en edificios corporativos tipo Prime A y B, administrados por CBRE Perú. A través de un enfoque técnico-metodológico aplicado en campo, se buscó reducir las fallas recurrentes que generaban pérdidas económicas significativas y afectaban la continuidad operativa de los edificios. El diagnóstico inicial evidenció un nivel de disponibilidad promedio por debajo del estándar de la industria, acompañado de mantenimientos correctivos reactivos sin planificación. En respuesta, se propuso un modelo de mejora estructurado en tres componentes RCM: (1) RCM-AMEF, (2) RCM con Ciclo Deming, y (3) RCM con mantenimiento preventivo planificado. Estas metodologías fueron validadas mediante un piloto de seis meses de duración, ejecutado en un conjunto de activos seleccionados. Los resultados demostraron una mejora sustancial: el MTBF se incrementó de 47.27 a 62.80 horas, el MTTR se redujo de 6.77 a 4.52 horas y la disponibilidad operativa alcanzó el 92.03 %. Económicamente, el proyecto obtuvo un VAN económico de S/ 178,728 y una TIR del 39.65 %. Además, se identificaron impactos positivos en la gestión tecnológica y el fortalecimiento de capacidades del personal técnico. Este trabajo aporta nuevo conocimiento en la aplicación funcional del RCM en entornos de gestión de activos en bienes raíces corporativos, y genera evidencia técnica útil para su replicación en otras instalaciones de alta criticidad.This professional sufficiency project focuses on the application of the Reliability-Centered Maintenance (RCM) methodology to improve the operational availability of critical electrical equipment—chillers, fire pumps, and ventilation systems—in Prime A and B corporate buildings managed by CBRE Peru. Through a technical-methodological approach applied in the field, the objective was to reduce recurrent failures that caused significant economic losses and compromised the operational continuity of the facilities. The initial diagnosis revealed an average availability level below industry standards, along with unplanned reactive corrective maintenance practices. In response, a structured improvement model was proposed, consisting of three RCM components: (1) RCM–FMEA, (2) RCM with the Deming Cycle, and (3) RCM with scheduled preventive maintenance. These methodologies were validated through a six-month pilot program executed on a selected set of critical assets. The results demonstrated substantial improvement: MTBF increased from 47.27 to 62.80 hours, MTTR was reduced from 6.77 to 4.52 hours, and operational availability reached 92.03%. Economically, the project achieved a Net Present Value (NPV) of S/ 178,728 and an Internal Rate of Return (IRR) of 39.65%. Additionally, positive impacts were identified in technological management and the strengthening of technical staff capabilities. This work contributes new knowledge regarding the functional application of RCM in corporate real estate asset management environments and provides useful technical evidence for replication in other high-criticality facilities.
Type
http://purl.org/coar/resource_type/c_7a1fRights
http://purl.org/coar/access_right/c_abf2Language
spaCollections
Except where otherwise noted, this item's license is described as http://purl.org/coar/access_right/c_abf2