Implementación de guía para elaborar modelos BIM mediante planos integrando C# y Dynamo para reducir el tiempo en una empresa de diseño
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2025-11-15Keywords
AutomatizaciónModelado BIM
Dynamo
C#
Interoperabilidad CAD-BIM
Automation
BIM modeling
Dynamo
C#
CAD-BIM interoperability
Metadata
Show full item recordOther Titles
Implementation of guidelines for creating BIM models using plans integrating C# and Dynamo to reduce time in a design companyAbstract
El exceso de tiempo y los reprocesos en la elaboración de modelos BIM en la etapa de diseño representan una problemática crítica en la gestión de proyectos de la empresa. Esta ineficiencia es consecuencia de la transferencia manual y no estandarizada de información de AutoCAD a Revit, dedicando demasiado tiempo a actividades repetitivas. En proyectos previos, esta metodología no estandarizada generó un sobrecosto del 8.52% en horas invertidas respecto al tiempo meta planificado. El objetivo de esta investigación fue implementar una guía metodológica estandarizada para la elaboración de modelos BIM a partir de planos AutoCAD, empleando las herramientas Dynamo y C# para automatizar la creación de elementos repetitivos en las especialidades de Arquitectura, Estructuras y MEP. La implementación de esta guía y el desarrollo de scripts de automatización demostraron una optimización sustancial. Se logró una reducción del 96% en el tiempo de modelado BIM por actividad automatizada, lo que se traduce en un ahorro de 85.63 horas en dos semanas, y el tiempo de replanteo por cambios se redujo en un 93%. El grado de certeza de los elementos automatizados alcanzó un 97%. Además, en la compatibilización de especialidades, se obtuvo una reducción del 99.6% del tiempo estimado, equivalente a 31.8 horas. Los resultados indican la validez de la guía implementada al usar Dynamo y C# para automatizar el proceso. Esta solución mejora directamente la interoperabilidad CAD-BIM, reduce significativamente los tiempos de modelado y retrabajos, y establece un precedente al garantizar alta certeza y potenciar la coordinación entre las especialidades.Excessive time and rework in the development of BIM models during the design stage represent a critical problem in the company’s project management. This inefficiency is a consequence of the manual and non-standardized transfer of information from AutoCAD to Revit, dedicating too much time to repetitive activities. In previous projects, this non-standardized methodology generated an 8.52% cost overrun in hours spent compared to the planned target time. The objective of this research was to implement a standardized methodological guide for the development of BIM models from AutoCAD drawings, using Dynamo and C# tools to automate the creation of repetitive elements in the fields of Architecture, Structures, and MEP. The implementation of this guide and the development of automation scripts demonstrated substantial optimization. A 96% reduction in BIM modeling time per automated activity was achieved, translating into a savings of 85.63 hours in two weeks, and the time spent on changes was reduced by 93%. The degree of certainty of the automated elements reached 97%. In addition, in the compatibility of specialties, a 99.6% reduction in estimated time was achieved, equivalent to 31.8 hours. The results indicate the validity of the guide implemented using Dynamo and C# to automate the process. This solution directly improves CAD-BIM interoperability, significantly reduces modeling and rework times, and sets a precedent by ensuring high accuracy and enhancing coordination between specialties.
Type
info:eu-repo/semantics/bachelorThesisRights
info:eu-repo/semantics/openAccessLanguage
spaCollections

