Procedure to Reduce Evaluation Time in the Selection of Professional Staff in Medium-Sized Multi-Family Construction Companies Using the AHP Method
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2025-01-01
Metadata
Show full item recordPublisher
Avestia PublishingJournal
International Conference on Civil Structural and Transportation EngineeringDOI
10.11159/iccste25.168Abstract
In the construction sector, the selection of personnel for the technical office faces challenges such as the lack of structure and subjectivity in the evaluation criteria, which makes it difficult to quickly identify the most suitable candidates. This article proposes an optimized procedure to address this problem through the use of the AHP multicriteria method and Expert Choice software. The process involves applying AHP to establish priorities and evaluate candidates based on previously defined objective criteria. Through interviews and surveys, deficiencies in the traditional approach were identified, such as the lack of planning and the reliance on subjective judgments. The proposal demonstrates how the application of AHP reduces the evaluation time by 70%, improving transparency, traceability, and reliability of the process, contributing to the formation of technical teams more aligned with the specific requirements of the projects.Type
info:eu-repo/semantics/articleRights
info:eu-repo/semantics/openAccessAttribution 4.0 International
Language
engEISSN
23693002ae974a485f413a2113503eed53cd6c53
10.11159/iccste25.168
Scopus Count
Collections
The following license files are associated with this item:
- Creative Commons


