Diseño de columna explosiva de taladros en realce para optimizar el ciclo de limpieza de tajeos en la Unidad Minera AGROMIN La Bonita S.A.C.
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2025-06-16Keywords
VoladuraGranulometría
Limpieza de mineral
Tajeos
Tiempo efectivo
Blasting
Fragment Size
Mucking
Stoping
Effective time
Metadata
Show full item recordAbstract
La limpieza de mineral representa un proceso de especial injerencia sobre la cadena de valor de una operación minera, por lo que se encuentra sometida a una recurrente evaluación de alternativas que coadyuven a mitigar diversos problemas. Bajo esta premisa, el presente trabajo de suficiencia profesional ostentó como propósito aumentar el tiempo efectivo de limpieza de mineral en los tajeos de producción, debido a que se genera un retraso en el ciclo de minado producto de la generación de bancos con una inadecuada granulometría producto de la voladura. En este sentido, se propuso diseñar y aplicar una configuración de columna explosiva tomando en consideración diversos factores controlables y no controlables como aspectos operativos, técnicos, geológicos y geomecánicos para brindar una propuesta de aplicación integral contra los retrasos en el ciclo de minado. Es preciso indicar que las variables independientes consideradas para el presente estudio sobrevienen de las condiciones geomecánicas particulares del tajeo analizado. De este modo, se procedió a determinar la configuración de la columna explosiva propicia para los taladros en realce bajo revisión de metodologías convenientes para una voladura efectiva. Posteriormente, se analizó la granulometría del material producto de la voladura convencional a diferencia de la voladura experimental mediante el software Split Desktop. Por último, se compararon los tiempos de limpieza del tajeo mediante el uso de winche de arrastre con la configuración de columna explosiva convencional y la configuración de columna explosiva experimental.Ore mucking represents a process of special impact on the value chain of a mining operation, and therefore is subject to ongoing evaluation of alternatives that help mitigate various problems. Under this premise, the purpose of this professional proficiency study was to increase the effective ore mucking time in production stope, due to the delay in the mining cycle caused by the generation of banks with inadequate grain size resulting from blasting. In this regard, a proposal was made to design and implement a blast column configuration taking into account various controllable and uncontrollable factors, such as operational, technical, geological, and geomechanical aspects, in order to provide a comprehensive application proposal to address delays in the mining cycle. It should be noted that the independent variables considered for this study arise from the specific geomechanical conditions of the stope analyzed. In this way, the blast column configuration optimal for the production drill holes was determined, under review of appropriate methodologies for effective blasting. Subsequently, the particle size distribution of the blasted material from the conventional blast was analyzed compared to the proposed blast using Split Desktop software. Finally, stope mucking times using a tow winch were compared with the conventional blast column configuration and the proposed blast column configuration.