Propuesta de mejora para incrementar el cumplimiento de las órdenes en el área de Termofijado mediante el uso de SMED, Trabajo Estandarizado y TPM en una empresa del sector textil
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Advisors
Rojas Teran, Carlos GustavoIssue Date
2025-06-15
Metadata
Show full item recordOther Titles
Improvement proposal to increase order fulfillment in the heat-setting area through the use of SMED, standardized work, and TPM in a textile companyAbstract
En el sector textil, la falta de cumplimiento de los plazos de entrega es una causa recurrente que afecta directamente al cliente y costos operativos. Para abordar esta problemática, se ha realizado una revisión exhaustiva de los procesos, respaldada por la recopilación de datos históricos. Tras analizar la información obtenida, se identificaron fallas en la maquinaria, reprocesos y largos tiempos de configuración como las principales causas del problema. Con el fin de abordar eficazmente estas dificultades, se ha diseñado un modelo combinado que integra el Mantenimiento Productivo Total, SMED y Trabajo Estándar. Este enfoque busca reducir el incumplimiento de los pedidos (OTD), disminuir los tiempos de entrega, minimizar las paradas no programadas y reducir los reprocesos. El trabajo se verificó mediante la implementación del piloto dentro del área de termofijado y a la máquina Ramadora, gracias al fue posible aumentar el cumplimiento de pedidos entregados a tiempo en 3.88%. Por consecuente, la disponibilidad del equipo Bruckner aumentó de 87.50% a 93.66%, el tiempo de configuración del equipo disminuyó de 22.17 a 14.06 minutos y el porcentaje de tela reprocesada se redujo de 7.54% a 3.28%. Finalmente, el periodo de recuperación de la inversión será de aproximadamente de 9 meses y por cada sol invertido generará un beneficio de 6 soles aproximadamente.In the textile sector, failure to meet delivery deadlines is a recurring problem that directly affects customer satisfaction and operating costs. To address this issue, an exhaustive review of the processes has been carried out, supported by the collection of historical data. After analyzing the information obtained, machinery failures, reprocessing and long configuration times were identified as the main causes of the problem. In order to effectively address these difficulties, a combined model has been designed that integrates TPM, Single Minute Exchange of Die and Standard Work. This approach seeks to reduce order non-compliance (OTD), reduce delivery times, minimize unscheduled stops, reduce rework, and improve market reputation. The work was verified through the implementation of the pilot within the thermosetting area and the Ramadora machine, thanks to which it was possible to increase the on-time delivery compliance by 3.88%. Consequently, the availability of the Bruckner equipment increased from 87.50% to 93.66%, the equipment setup time decreased from 22.17 to 14.06 minutes, and the percentage of reprocessed fabric decreased from 7.54% to 3.28%. Finally, the payback period for the investment will be approximately 9 months and for every sol invested, it will generate a benefit of approximately 6 soles.
Type
info:eu-repo/semantics/bachelorThesisRights
info:eu-repo/semantics/restrictedAccessLanguage
spaCollections
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/restrictedAccess


