APLICACIÓN DE LA METODOLOGÍA VDC PARA CUMPLIR EL PRESUPUESTO Y PLAZO EN PROYECTOS DE MONTAJE DE ESTRUCTURAS METÁLICAS ESPECIALES EN EL SECTOR MINERO. CASO DE ESTUDIO: MONTAJE DE ESTRUCTURA METÁLICA Y COBERTURA DE LA PILA DE INTERMEDIOS EN MINERA DEL SUR DEL PERÚ
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Advisors
Uehara Yagi, José DanielIssue Date
2024-11-27
Metadata
Show full item recordOther Titles
Application of VDC methodology to meet budget and deadline in assembly projects of special metal structures in the mining sector. Study case: assembly of metal structure and coverage of the intermediate pile in mining in southern PerúAbstract
Actualmente estamos viviendo un cambio en el enfoque de cómo llegar al éxito grandes proyectos de construcción, estamos pasando de un enfoque tradicional a un enfoque colaborativo y en Perú tenemos casos de éxito como la construcción de la villa Panamericana. Un eje para el éxito de proyectos a través de entornos colaborativos es la aplicación de VDC. El presente caso de estudios consiste en elaborar una propuesta en la que aplica Virtual Design and Construction (VDC) basado en el análisis de un caso de estudios. Específicamente se tomará el caso del montaje de una estructura especial situado en una minera del sur del Perú, desarrollado entre los años 2014 y 2015 el cual tenía la particularidad de ser en ese momento una estructura de geometría y diseño único en Sudamérica, lo cual trajo consigo pérdidas económicas por el hecho de la improductividad y penalidades debido a los atrasos sustentado en tener una curva de aprendizaje muy lenta producto del desconocimiento del montaje de dicha estructura especial. De haber tenido el proyecto construido previamente de forma virtual se tendrían las herramientas para optimizar los procesos de construcción aumento con esto la eficiencia del flujo de trabajo, mejora de calidad y reducción de riesgos y esto es uno de los fundamentos más importantes de la metodología VDC: “construir dos veces, primero virtual y después real”. Para tal fin y motivo del caso de estudios, se desarrollará la propuesta para la implementación de VDC a mencionado Proyecto, identificando los principales problemas del caso y los objetivos del cliente, sustentando la propuesta de acuerdo con la investigación que se lleva a cabo, planteando mejoras en base a la implementación de BIM, ICE y PPM.Currently, we are experiencing a change in the approach to how to achieve success in large construction projects, we are moving from a traditional approach to a collaborative approach and in Peru we have success stories such as the construction of the Panamerican village. An axis for the success of projects through collaborative environments is the application of VDC. This case study consists of developing a proposal in which Virtual Design and Construction (VDC) is applied based on the analysis of a case study. Specifically, the case of the assembly of a special structure located in a mining company in southern Peru will be taken, developed between 2014 and 2015, which had the particularity of being at that time a structure with a unique geometry and design in South America, which brought I entail economic losses due to unproductivity and penalties due to delays sustained by having a very slow learning curve as a result of ignorance of the assembly of said special structure. If you had previously built the project virtually, you would have the tools to optimize the construction processes, thereby increasing the efficiency of the workflow, improving quality and reducing risks, and this is one of the most important foundations of the VDC methodology. : “build twice, first virtual and then real.” For this purpose and reason for the case studies, the proposal for the implementation of VDC to the aforementioned Project will be developed, identifying the main problems of the case and the client's objectives, supporting the proposal in accordance with the research that is carried out, proposing improvements based on the implementation of BIM, ICE and PPM.
Type
info:eu-repo/semantics/masterThesisRights
info:eu-repo/semantics/openAccessLanguage