Integrated Maintenance Management to Increase the Availability of Drilling Equipment: Case Study in a Peruvian Mine
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2024-01-01
Metadata
Show full item recordPublisher
Trans Tech Publications LtdJournal
Advances in Science and TechnologyDOI
10.4028/p-mVl8WTAbstract
Drilling equipment is the main asset of mining companies; therefore, a decrease in the operability and availability of such equipment can generate negative impacts on organizations, such as the generation of extra expenses due to the hiring of third parties for the performance of activities and contractual projects. According to statistics from previous studies, the availability of equipment in the sector should be 95% to be considered optimal for use in mining operations. Equipment downtime can be avoided by establishing and following a preventive maintenance schedule and having spare parts and hydraulic components readily available for maintenance. The purpose of this work is the implementation and follow-up of a maintenance management plan based on a failure mode analysis and autonomous maintenance and preventive maintenance with the purpose of keeping the equipment in optimal conditions, maintaining an adequate level of availability and extending the useful life of the assets. With the simulation of the Arena program, a possible availability of 95% was evidenced, which corresponds to being adequate for the optimal operation of the equipment and the continuity of the projects.Type
info:eu-repo/semantics/articleRights
info:eu-repo/semantics/embargoedAccessLanguage
engISSN
16628969EISSN
16620356ae974a485f413a2113503eed53cd6c53
10.4028/p-mVl8WT
Scopus Count
Collections
