Integration of 4D BIM, PtD and databases to improve OHS and knowledge management in construction
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2024-01-01Keywords
Building Information Modelling (BIM)Continuous improvement
Hazard identification
Integral approach
Occupational Health and Safety (OHS) Management
Prevention through Design (BIM)
Risk management
Ultra Safety Design (USD)
Metadata
Show full item recordPublisher
Avestia PublishingJournal
International Conference on Civil, Structural and Transportation EngineeringDOI
https://doi.org/10.11159/iccste24.145Abstract
The construction industry faces high incidences of accidents and injuries, resulting in project delays, additional costs, and loss of lives. In developing countries, conventional methods are employed to identify risks and prevent accidents due to limited familiarity with tools such as Building Information Modelling (BIM) and Safety and Health Management (SHM) models. Furthermore, the lack of knowledge retention and lessons learned hinders continuous improvement in safety. Previous research has proposed specific solutions to address these issues, including the integration of BIM in occupational risk management, the use of technology to store safety data, and the application of the Prevention through Design (PtD) approach. However, these solutions tend to focus on individual challenges. This paper introduces a novel methodology called Ultra Safety Design (USD), which comprehensively addresses OHS management in construction projects. USD combines the use of BIM, PtD, and a centralized database. BIM enables precise identification of hazards and risks during the design stages, facilitating the implementation of appropriate control measures. PtD promotes a proactive safety mindset by preventing risks from the design phase, and the centralized database allows for knowledge retention, information exchange, and referencing of previous projects, fostering a culture of continuous improvement. The study's results demonstrate effective risk mitigation, with a significant reduction in overall risk levels. The USD methodology proves to be an integral and effective approach to address OHS management in construction, integrating multiple tools and promoting continuous improvement in OHS practices.Type
info:eu-repo/semantics/articleRights
info:eu-repo/semantics/openAccessLanguage
engEISSN
23693002ae974a485f413a2113503eed53cd6c53
https://doi.org/10.11159/iccste24.145
Scopus Count
Collections
The following license files are associated with this item:
- Creative Commons