• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería Civil
  • View Item
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería Civil
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All of UPCCommunitiesTitleAuthorsAdvisorIssue DateSubmit DateSubjectsThis CollectionTitleAuthorsAdvisorIssue DateSubmit DateSubjectsProfilesView

My Account

LoginRegister

Quick Guides

AcercaPolíticasPlantillas de tesis y trabajos de investigaciónFormato de publicación de tesis y trabajos de investigaciónFormato de publicación de otros documentosLista de verificación

Statistics

Display statistics

Improvement model to increase efficiency through the use of 5S, TPM and SMED tools in a plastic SME company

  • CSV
  • RefMan
  • EndNote
  • BibTex
  • RefWorks
Average rating
 
   votes
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item. When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
 
Your vote was cast
Thank you for your feedback
Authors
Allca Chauca, Valeria S.
Yauri Mendoza, Ana C.
Sáenz Morón, Martin J.
Issue Date
2023-01-01
Keywords
5S
Efficiency
Plastics industry
SMED
TPM

Metadata
Show full item record
Publisher
Latin American and Caribbean Consortium of Engineering Institutions
Journal
Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
URI
http://hdl.handle.net/10757/669505
Abstract
Over time, the manufacturing industry has evolved enormously, requiring increasingly efficient processes, with reduced repair times and fewer defects. In this sense, in the case study a low efficiency in the production process was identified, given that the percentage in the plastics sector is 73%. Therefore, a more detailed analysis was carried out and it was found that high repair time and reprocessing due to defects are the main causes. Consequently, an improvement model based on 5S, TPM and SMED tools is proposed with the objective of reducing the costs of the described problem, which are equivalent to 7.45% of revenues. In addition, it seeks to reduce reprocesses due to defects by 43%, while repair time is reduced by 77%. Applying the presented model, it was obtained a decrease of the presented 5S deficiencies by 11.50%, increase of efficiency to 73.65%, improvement of machine availability to 85.46% and reduction by 1.36% and up to 39.24 of the effects of burn marks and setup time, respectively. Thus, it is expected that companies belonging to the plastics or related sectors will use the results obtained as a reference for improvement.
Type
info:eu-repo/semantics/article
Rights
info:eu-repo/semantics/embargoedAccess
Language
eng
EISSN
24146390
Collections
Ingeniería Civil

entitlement

 

DSpace software (copyright © 2002 - 2026)  DuraSpace
Quick Guide | Contact Us
Alicia
La Referencia
Open Repository is a service operated by 
Atmire NV
 

Export search results

The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.