Show simple item record

dc.contributor.advisorFlores Pérez, Alberto Enrique
dc.contributor.authorDe Fuentes Pérez , Iván
dc.date.accessioned2022-01-06T05:23:55Z
dc.date.available2022-01-06T05:23:55Z
dc.date.issued2021-07-10
dc.identifier.urihttp://hdl.handle.net/10757/658464
dc.description.abstractThe zinc refinery for its non-conforming products in quality presents losses in the daily production that must be delivered to its main clients, with monetary losses that are quantified in $ 3,000,000 per year and the prestige before its client portfolio. This occurs due to a lack of controls, operational standards and discipline in the execution of the tasks of the operators in the production lines that guarantee the quality of zinc with a purity of 99.995%. The objective of the work carried out was to evaluate the economic losses and the reasons that these losses cause for the companies and an improvement action plan was designed to solve these problems under the implementation of Lean Manufacturing tools such as 5 S, TPM and standardization of procedures. The development of the tools included analyzing the current state, making a diagnosis and an action plan for each system with those responsible for each area, and finally measuring the effectiveness of the tools with a reduction in losses of 15% in the first year and so on.es_PE
dc.description.abstractLas refinerías de zinc presentan perdidas en la producción diaria debido a productos no conformes por su calidad, con pérdidas monetarias que se cuantifican en $3.000.000 por año y el prestigio ante su cartera de clientes. Esto ocurre por falta de controles, estándares operacionales y disciplina en la ejecución de las tareas de los operadores en las líneas de producción que garanticen la calidad del zinc con una pureza del 99,995 %. El objetivo del trabajo realizado fue evaluar las pérdidas económicas y los motivos que ocasionan las mismas. Se diseñó un plan de acción de mejora para solucionar estos problemas bajo la implementación de las herramientas de Lean Manufacturing como 5S, TPM y estandarización de procedimientos. El desarrollo de las herramientas abarco analizar el estado actual, realizar un diagnóstico y un plan de acción por cada sistema con los responsables de cada área y finalmente medir la efectividad de las herramientas con una previsión de reducción de las pérdidas del 15% en el primer año y así consecutivamente durante los cinco primeros años.es_PE
dc.description.uriTrabajo de Suficiencia Profesionales_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.formatapplication/epubes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Peruana de Ciencias Aplicadas (UPC)es_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAttribution-NonCommercial-ShareAlike 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceUniversidad Peruana de Ciencias Aplicadas (UPC)es_PE
dc.sourceRepositorio Académico - UPCes_PE
dc.subjectLean manufacturinges_PE
dc.subjectEstandarización de procesoses_PE
dc.subjectMetodología 5ses_PE
dc.subjectStandardization of processeses_PE
dc.subject5s methodologyes_PE
dc.titlePropuesta de mejora para disminuir los reprocesos del producto en una refinería de zinc utilizando herramientas lean manufacturinges_PE
dc.title.alternativeImprovement proposal to reduce product reprocesses in a zinc refinery using lean manufacturing toolses_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Peruana de Ciencias Aplicadas (UPC). Facultad de Ingenieríaes_PE
thesis.degree.levelLicenciaturaes_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero industriales_PE
refterms.dateFOA2022-02-02T03:13:28Z
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.00.00es_PE
dc.identifier.isni0000 0001 2196 144X
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional
renati.advisor.orcidhttps://orcid.org/0000-0003-0813-0662es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline722026es_PE
dc.publisher.countryPEes_PE
dc.type.otherTrabajo de suficiencia profesionales_PE


Files in this item

Thumbnail
Name:
De Fuentes_PI.pdf
Size:
4.883Mb
Format:
PDF
Thumbnail
Name:
De Fuentes_PI.docx
Embargo:
2091-12-31
Size:
11.14Mb
Format:
Microsoft Word 2007
Thumbnail
Name:
De Fuentes_PI_Ficha.pdf
Embargo:
2091-12-31
Size:
475.8Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess