Production Planning and Control Model to Increase On-Time Deliveries Through Demand-Driven MRP and PDCA in a Make-to-Order Environment of Non-primary Manufacturing Industry
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2022-01-01
Metadata
Show full item recordJournal
Lecture Notes in Networks and SystemsDOI
10.1007/978-3-030-85540-6_155Additional Links
https://www.springerprofessional.de/en/production-planning-and-control-model-to-increase-on-time-delive/19647978Abstract
In recent years, production environments have gone from predictable to dynamic, therefore factors such as delivery time and a high percentage of customer satisfaction have become fundamental criteria for this new environment. Production planning and control (PPC) systems must be aligned with the new objectives of the manufacturers, however, the most popular PPC don’t satisfy their needs. This is how this article proposes a PPC model based on the Demand-Driven MRP system supported by the stages of the PDCA cycle so that it can perform optimally in dynamic environments such as make-to-order manufacturing models. As a result of the simulation in the case study, 100% compliance with deliveries on time was obtained and a reduction in lead time by 50.33%. Therefore, it is concluded that the proposed model is applicable and beneficial in this context.Type
info:eu-repo/semantics/articleRights
info:eu-repo/semantics/embargoedAccessLanguage
engDescription
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.ISSN
23673370EISSN
23673389ae974a485f413a2113503eed53cd6c53
10.1007/978-3-030-85540-6_155
Scopus Count
Collections