Modelo de mantenimiento basado en las herramientas BPM, SMED y TPM para incrementar la eficiencia productiva de una MYPE del sector plásticos
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2021-08-10Keywords
ProductividadMantenimiento autónomo
Sector plásticos
Mypes
Productivity
Autonomous maintenance
Plastics sector
Metadata
Show full item recordOther Titles
Maintenance model based on BPM, SMED and TPM tools to increase the productive efficiency of a MYPE in the plastics sectorAbstract
A lo largo de los años el sector plástico ha tenido un crecimiento continuo, generando un aumento de la productividad. Sin embargo, en las MYPES se produjo una repercusión negativa, debido al bajo nivel de eficiencia productiva. La presente investigación tiene como caso de estudio a una MYPE del sector en cuestión. El análisis determinó que los motivos principales del problema eran los altos tiempos improductivos por averías y el excesivo tiempo de realización del setup. Por ello, se propone un modelo de manteamiento basado en las herramientas BPM, SMED y los pilares mantenimiento autónomo y planificado del TPM, el cual brindó los siguientes resultados: reducción del MTTR de 5.33 hr a 2.63 hr, los tiempos de averías de 36 hr a 14 hr al mes y el tiempo de setup de 125.07 min a 52.61 min. Asimismo, el nivel de satisfacción de compra de repuestos incrementó de 62% a 96%. Finalmente, luego de la validación se concluye que se logró incrementar la eficiencia productiva de 44% a 69%.Throughout the years the plastic sector has had a continuous growth, generating an increase in productivity. However, in the MYPES there was a negative impact, due to the low level of productive efficiency. The present investigation has as a case study a MYPE of the sector in question. The analysis determined that the main reasons for the problem were high downtime due to breakdowns and excessive setup time. For this reason, a maintenance model is proposed based on the BPM, SMED tools and the autonomous and planned maintenance pillars of the TPM, which provided the following results: reduction of the MTTR from 5.33 hr to 2.63 hr, breakdown times from 36 hr at 14 hr per month and the setup time from 125.07 min to 52.61 min. Likewise, the level of satisfaction with the purchase of spare parts increased from 62% to 96%. Finally, after validation, it is concluded that it was possible to increase production efficiency from 44% to 69%.
Type
info:eu-repo/semantics/bachelorThesisRights
info:eu-repo/semantics/openAccessLanguage
spaCollections
The following license files are associated with this item:
- Creative Commons