Pavement management system to improve local road administration using PCI, IRI and PSI for pavement failures identification
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2020-09-30
Metadata
Show full item recordJournal
2020 Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2020 - Conference ProceedingsDOI
10.1109/CONIITI51147.2020.9240361Additional Links
https://ieeexplore.ieee.org/document/9240361Abstract
A pavement management system (PMS) is a tool that supports decision-making specialists to maintain the pavement at an optimal service level. The absence of a PMS could lead to inadequate decision-making, a disorganized road inventory, poor selection in road maintenance techniques and inefficient technical support to justify the execution of maintenance activities. For these reasons, this research proposes the application of a PMS, with the objective of improving and standardizing the processes for evaluating the condition of roads that are under the jurisdiction of low-budget government organizations, guaranteeing the selection of the most appropriate type of maintenance. As a case of study, a 1.1 km local road located in one of the districts of Lima was evaluated, which was divided into 11 sections. With this evaluation, it was obtained that 2,605.43 m2 of the total road is in poor condition, due to the presence of functional failures. For the identification of failures, the pavement condition index (PCI), the international roughness index (IRI) and the present serviceability index (PSI) were used to determine the condition, roughness and serviceability of the pavement. In conclusion, it was identified that the proposed PMS is adequately adapted to the way of working and available budget of a local administration, since if it is applied it would only spend 20.55% of the fund that would be destined to a total reconstruction of road.Type
info:eu-repo/semantics/articleRights
info:eu-repo/semantics/embargoedAccessLanguage
engDescription
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.ae974a485f413a2113503eed53cd6c53
10.1109/CONIITI51147.2020.9240361
Scopus Count
Collections