LEAN maintenance model based on change management allowing the reduction of delays in the production line of textile SMEs in Peru
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2020-04-06
Metadata
Show full item recordPublisher
Institute of Physics PublishingJournal
IOP Conference Series: Materials Science and EngineeringDOI
10.1088/1757-899X/796/1/012017Abstract
This article examines the problem of production line delays in a textile small- and medium-sized enterprise (SME) that produces polyester fibre from recycled bottles, based on orders. Factors that have resulted in production line delays include prolonged unscheduled maintenance time, and preparations and adjustments prior to operating the equipment. To address the problem, a model was developed applying lean manufacturing tools through change management, with the aim of increasing equipment availability and useful life. To validate the model, a pilot was developed to determine how the increase in equipment availability helps reduce delays in the production line, which eventually improves completion of customer orders.Type
info:eu-repo/semantics/articleRights
info:eu-repo/semantics/openAccessAttribution-NonCommercial-ShareAlike 4.0 International
Language
engISSN
17578981EISSN
1757899Xae974a485f413a2113503eed53cd6c53
10.1088/1757-899X/796/1/012017
Scopus Count
Collections
The following license files are associated with this item:
- Creative Commons