• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería de Gestión Empresarial
  • View Item
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería de Gestión Empresarial
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All of UPCCommunitiesTitleAuthorsAdvisorIssue DateSubmit DateSubjectsThis CollectionTitleAuthorsAdvisorIssue DateSubmit DateSubjectsProfilesView

My Account

LoginRegister

Quick Guides

AcercaPolíticasPlantillas de tesis y trabajos de investigaciónFormato de publicación de tesis y trabajos de investigaciónFormato de publicación de otros documentosLista de verificación

Statistics

Display statistics

Project planning methodology based on lean philosophy and PMBOK guidelines for SMEs in the electricity sector

  • CSV
  • RefMan
  • EndNote
  • BibTex
  • RefWorks
Average rating
 
   votes
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item. When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
 
Your vote was cast
Thank you for your feedback
Authors
Bazán, Denisse
Pinedo, Marco
Rojas, José
Raymundo, Carlos
Issue Date
2020-01-01
Keywords
Electrical projects
Lean project
Planning process group
PMI

Metadata
Show full item record
Publisher
Springer Verlag
Journal
Advances in Intelligent Systems and Computing
URI
http://hdl.handle.net/10757/656367
DOI
https://doi.org/10.1007/978-3-030-25629-6_133
Additional Links
https://link.springer.com/chapter/10.1007/978-3-030-25629-6_133
Abstract
Currently, businesses implementing electrical projects lack the theoretical knowledge of ways to correctly develop the projects given that they are based on empirical knowledge. Consequently, a need has developed to implement lean philosophy and project management as distinctive and renowned pillars to ensure high competitiveness in the market of the sector under study. Through case studies, the literature on the subject demonstrated the importance of proper planning based on cost and time pillars. These pillars were analyzed using Ishikawa tools and a problem tree. The following lean tools were chosen: 5S, visual management, and quality circles. These tools and the project management guidelines, specifically the 47 processes published in the 5th edition of the Project Management Body of Knowledge, were applied as a model proposal at a pilot company in which the results of how this combination of solutions reduces delivery times for that organization were compared.
Type
info:eu-repo/semantics/article
Rights
info:eu-repo/semantics/embargoedAccess
Language
eng
Description
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.
ISSN
21945357
EISSN
21945365
ae974a485f413a2113503eed53cd6c53
https://doi.org/10.1007/978-3-030-25629-6_133
Scopus Count
Collections
Ingeniería de Gestión Empresarial

entitlement

 

DSpace software (copyright © 2002 - 2026)  DuraSpace
Quick Guide | Contact Us
Alicia
La Referencia
Open Repository is a service operated by 
Atmire NV
 

Export search results

The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.