• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   INICIO
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería de Gestión Minera
  • Ver ítem
  •   INICIO
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería de Gestión Minera
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todos los contenidosComunidades & ColeccionesTítuloAutorAsesorFecha PublicaciónFecha de envíoMateriaEsta colecciónTítuloAutorAsesorFecha PublicaciónFecha de envíoMateriaPerfiles de autorVer

Mi cuenta

AccederRegistro

Quick Guides

AcercaPolíticasPlantillas de tesis y trabajos de investigaciónFormato de publicación de tesis y trabajos de investigaciónFormato de publicación de otros documentosLista de verificación

Estadísticas

Mostrar estadísticas

Optimized model for pre-cut blasting in mining operations in underground mining in Peru

  • CSV
  • RefMan
  • EndNote
  • BibTex
  • RefWorks
Average rating
 
   votes
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item. When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
 
Your vote was cast
Thank you for your feedback
Autor
Pomasoncco, Alexander
Trujillo, Claudio
Arauzo, Luis
Raymundo, Carlos
Fecha de publicación
2019-01-01
Palabras clave
Blast
Costs
Design
Pre-splitting
Support

Metadatos
Mostrar el registro completo del ítem
Editorial
International Institute of Informatics and Systemics, IIIS
Journal
IMCIC 2019 - 10th International Multi-Conference on Complexity, Informatics and Cybernetics, Proceedings
URI
http://hdl.handle.net/10757/656287
Resumen
In the mining industry of Peru, as a consequence of large scale mineral extraction and a dynamic process of ore dressing, the different activities of the operation are neglected. This neglect, in some cases, generates collateral damages that affect the structures, generate extra costs, and result in constant accidents due to rock-fall and delays in the activities of the mining cycle and the ones following it, which seriously harms the Mining Unit and directly affects the workers. In addition, this is directly related to the progress of the daily work and, in turn, it is related to the design of the mine mesh that is prepared to extract the largest possible mineral amounts per shift. This means that, by modifying the design of the mine mesh, the blasting method, and the type of explosive used, the current scenario and the results could be modified. In this respect, a research was conducted, exclusively based on simulations using the JK Simblast software, applying the pre-splitting blast method in the underground mine of the Minera Aurífera Retamas SA company, resulting in a reduction of over break in more than 60% as compared to the mesh used initially. This has an impact on the level of support to be used, and therefore, on the maintenance costs, which were reduced by 18%. Therefore, this article presents the possibility of reducing maintenance costs in underground mining using pre-splitting blasting. Copyright 2019.
Tipo
info:eu-repo/semantics/article
Derechos
info:eu-repo/semantics/embargoedAccess
Idioma
eng
Descripción
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.
Colecciones
Ingeniería de Gestión Minera

entitlement

 

DSpace software (copyright © 2002 - 2022)  DuraSpace
Quick Guide | Contacto
Alicia
La Referencia
Open Repository is a service operated by 
Atmire NV
 

Export search results

The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.