Show simple item record

dc.contributor.authorRojas, Kevin
dc.contributor.authorAramburú, Vidal
dc.contributor.authorRamos, Edgar
dc.contributor.authorRaymundo, Carlos
dc.contributor.authorMoguerza, Javier M.
dc.date.accessioned2021-06-01T12:13:47Z
dc.date.available2021-06-01T12:13:47Z
dc.date.issued2019-06-06
dc.identifier.issn21945357
dc.identifier.doi10.1007/978-3-030-20494-5_34
dc.identifier.urihttp://hdl.handle.net/10757/656285
dc.descriptionEl texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.en_US
dc.description.abstractIn the mining industry, the mining cycle is a very important part in the operating stage of every mining unit. Through the exploitation method used, the mining cycle provides mineral ore, which subsequently undergoes various metallurgical processes and its commercialization and thereby generates profits to the mining company. Currently, within this cycle, the hauling and transportation stages are those that have a lower efficiency with respect to the drilling and blasting stages. Therefore, the sector is always seeking effective ways to optimize these processes, reduce downtime and increase productivity. Six Sigma is a technique that allows for the continuous process improvement. In this study, the factors that generate inefficiency in the hauling cycle are determined, and alternatives are implemented to solve the main problem and improve the operations cycle.en_US
dc.formatapplication/htmlen_US
dc.language.isoengen_US
dc.publisherSpringer Verlagen_US
dc.relation.urlhttps://link.springer.com/chapter/10.1007/978-3-030-20494-5_34en_US
dc.rightsinfo:eu-repo/semantics/embargoedAccessen_US
dc.sourceUniversidad Peruana de Ciencias Aplicadas (UPC)es_PE
dc.sourceRepositorio Académico - UPCes_PE
dc.subjectDowntimesen_US
dc.subjectDumperen_US
dc.subjectHaulingen_US
dc.subjectOverhand cut and fillen_US
dc.subjectProductivityen_US
dc.subjectSix sigmaen_US
dc.titleSix sigma-based optimization model in hauling cut and fill exploitation activities to reduce downtime in underground mines in Peruen_US
dc.typeinfo:eu-repo/semantics/articleen_US
dc.identifier.journalAdvances in Intelligent Systems and Computingen_US
dc.identifier.eid2-s2.0-85067412594
dc.identifier.scopusidSCOPUS_ID:85067412594
dc.source.journaltitleAdvances in Intelligent Systems and Computing
dc.source.volume971
dc.source.beginpage365
dc.source.endpage375
dc.identifier.isni0000 0001 2196 144X


This item appears in the following Collection(s)

Show simple item record