• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería Industrial
  • View Item
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería Industrial
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All of UPCCommunitiesTitleAuthorsAdvisorIssue DateSubmit DateSubjectsThis CollectionTitleAuthorsAdvisorIssue DateSubmit DateSubjectsProfilesView

My Account

LoginRegister

Quick Guides

AcercaPolíticasPlantillas de tesis y trabajos de investigaciónFormato de publicación de tesis y trabajos de investigaciónFormato de publicación de otros documentosLista de verificación

Statistics

Display statistics

Improvement of the polymer insulation production process using lean manufacturing tools and plant layout design

  • CSV
  • RefMan
  • EndNote
  • BibTex
  • RefWorks
Average rating
 
   votes
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item. When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
 
Your vote was cast
Thank you for your feedback
Authors
Arroyo-Andrade, Flavio
Coral-Rodriguez, Pebelyh
Cabel-Pozo, Jhonatan
Alvarez, Jose
Issue Date
2021-01-01
Keywords
5S’s
Layout
Lean
Lean Manufacturing
Polymeric insulator
Production capacity
Value Stream Mapping

Metadata
Show full item record
Publisher
Springer
Journal
Advances in Intelligent Systems and Computing
URI
http://hdl.handle.net/10757/656032
DOI
https://doi.org/10.1007/978-3-030-55307-4_87
Additional Links
https://link.springer.com/chapter/10.1007/978-3-030-55307-4_87
Abstract
This study focuses on problems of inadequate production capacity management. The factors that generate this scenario are related to the incorrect distribution of work areas, the absence of standardization of the production process and unorganized workstations in the production line. The application of 5S’s tool, Value Stream Mapping (VSM) and a proposal for plant design are presented to solve the problem. After the application of the design solution, it was identified that 1 h and 23 min can be saved in transfer times, which can be invested in the manufacture of more products, improving the use of the plant’s capacity.
Type
info:eu-repo/semantics/article
Rights
info:eu-repo/semantics/embargoedAccess
Language
eng
Description
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.
ISSN
21945357
EISSN
21945365
ae974a485f413a2113503eed53cd6c53
https://doi.org/10.1007/978-3-030-55307-4_87
Scopus Count
Collections
Ingeniería Industrial

entitlement

 

DSpace software (copyright © 2002 - 2026)  DuraSpace
Quick Guide | Contact Us
Alicia
La Referencia
Open Repository is a service operated by 
Atmire NV
 

Export search results

The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.