Lean Six Sigma Fleet Management Model for the Optimization of Ore Transportation in Mechanized Underground Mines in Peru
dc.contributor.author | Huaira-Perez, Jorge | |
dc.contributor.author | Llerena-Vargas, Orlando | |
dc.contributor.author | Pehóvaz-Alvarez, Humberto | |
dc.contributor.author | Solis-Sarmiento, Hugo | |
dc.contributor.author | Aramburu-Rojas, Vidal | |
dc.contributor.author | Raymundo, Carlos | |
dc.date.accessioned | 2021-01-11T23:46:09Z | |
dc.date.available | 2021-01-11T23:46:09Z | |
dc.date.issued | 2021-01-01 | |
dc.identifier.issn | 21903018 | |
dc.identifier.doi | 10.1007/978-3-030-57548-9_40 | |
dc.identifier.uri | http://hdl.handle.net/10757/653823 | |
dc.description | El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. | en_US |
dc.description.abstract | Mining activities around the world are undergoing constant change and modernization owing to technological and scientific advancements. Consequently, there are frequent proposals to streamline and enhance processes in mining operations. This study deals with ore transportation in mechanized mining units and aims to optimize fleet management using the Lean Six Sigma methodology to obtain a model in this specific process. The proposed method was implemented using a Lean Six Sigma instrument known as DMAIC (Define, Measure, Analyze, Improve, and Control). The case study was applied to an underground mine located in the Huancavelica region, Peru. The simulation showed that 24% of the time in the ore transport cycle is un-productive time and the improvement potential time represents 53% of the transportation process time. | en_US |
dc.language.iso | eng | en_US |
dc.relation.url | https://www.scopus.com/record/display.uri?eid=2-s2.0-85098120200&doi=10.1007%2f978-3-030-57548-9_40&origin=inward&txGid=2a5b8a6481d510815698ec2b2723b8bb | en_US |
dc.rights | info:eu-repo/semantics/embargoedAccess | es_PE |
dc.source | Universidad Peruana de Ciencias Aplicadas (UPC) | es_PE |
dc.source | Repositorio Académico - UPC | es_PE |
dc.subject | Fleet management | en_US |
dc.subject | Lean Six Sigma | en_US |
dc.subject | Mechanized underground mining | en_US |
dc.subject | Ores transportation | en_US |
dc.subject | Lean production | en_US |
dc.subject | Process engineering | en_US |
dc.subject | Process monitoring | en_US |
dc.subject | Silicon | en_US |
dc.subject | Six sigma | en_US |
dc.subject | Underground mine transportation | en_US |
dc.title | Lean Six Sigma Fleet Management Model for the Optimization of Ore Transportation in Mechanized Underground Mines in Peru | en_US |
dc.type | info:eu-repo/semantics/article | en_US |
dc.type | Other | en_US |
dc.identifier.eissn | 21903026 | |
dc.identifier.journal | Smart Innovation, Systems and Technologies | en_US |
dc.identifier.eid | 2-s2.0-85098120200 | |
dc.identifier.scopusid | SCOPUS_ID:85098120200 | |
dc.source.journaltitle | Smart Innovation, Systems and Technologies | |
dc.source.volume | 201 | |
dc.source.beginpage | 429 | |
dc.source.endpage | 438 | |
dc.identifier.isni | 0000 0001 2196 144X |