• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería Civil
  • View Item
  •   Home
  • Artículos científicos
  • Pregrado
  • Facultad de Ingeniería
  • Ingeniería Civil
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All of UPCCommunitiesTitleAuthorsAdvisorIssue DateSubmit DateSubjectsThis CollectionTitleAuthorsAdvisorIssue DateSubmit DateSubjectsProfilesView

My Account

LoginRegister

Quick Guides

AcercaPolíticasPlantillas de tesis y trabajos de investigaciónFormato de publicación de tesis y trabajos de investigaciónFormato de publicación de otros documentosLista de verificación

Statistics

Display statistics

Daily Control System for the Construction of Multi-family Building Projects

  • CSV
  • RefMan
  • EndNote
  • BibTex
  • RefWorks
Average rating
 
   votes
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item. When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
 
Your vote was cast
Thank you for your feedback
Authors
Fernandez, Diego
Zamora, Yeffry
Rodriguez, Sandra
Vilcapoma, Jorge
Issue Date
2021-01-01
Keywords
Building projects
Cost reduction variability
Management
Budget control
Construction
Construction industry
Control systems
Data handling
Losses
Construction projects

Metadata
Show full item record
Publisher
Springer Science and Business Media Deutschland GmbH
Journal
Smart Innovation, Systems and Technologies
URI
http://hdl.handle.net/10757/653822
DOI
https://doi.org/10.1007/978-3-030-57548-9_59
Additional Links
https://www.scopus.com/record/display.uri?eid=2-s2.0-85098120291&doi=10.1007%2f978-3-030-57548-9_59&origin=inward&txGid=32a10ea06fc3055d19fa4ca0ecca8ea8
Abstract
Construction projects for buildings, in the execution stage, show a variation of the real with respect to what is planned in the budget. The consequence of this lag presented usually causes large economic losses. Given this situation, in the construction industry, various control systems have been developed that have as a final deliverable a frequent management report, which serves to make decisions regarding the analyzed, whose results are applied and evaluated after a specific period of time. These management reports have good results at the time of their application; however, data processing, analysis execution, and decision making take approximately 30 days. In this sense, the present investigation proposes to develop a control system focused in real time, generated by the daily control in the execution stage. The results show a reduction of waste in the main resources of multi-family building projects, and this is in labor and materials, identifying the causes that originate them and suggesting generic solutions, at the end of the workday.
Type
info:eu-repo/semantics/article
Rights
info:eu-repo/semantics/embargoedAccess
Language
eng
Description
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.
ISSN
21903018
EISSN
21903026
ae974a485f413a2113503eed53cd6c53
https://doi.org/10.1007/978-3-030-57548-9_59
Scopus Count
Collections
Ingeniería Civil

entitlement

 

DSpace software (copyright © 2002 - 2026)  DuraSpace
Quick Guide | Contact Us
Alicia
La Referencia
Open Repository is a service operated by 
Atmire NV
 

Export search results

The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.