Diseño de puente segmental de 385 metros de longitud por la metodología constructiva de dovelas sucesivas como propuesta de solución a los efectos del Fenómeno del Niño sobre la quebrada venados en el distrito de Lancones, Sullana-Piura
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2020-07-13Keywords
Puente segmentalConcreto presforzado
Hidrología
Segmental bridge
Prestressed concrete
Hydrology
Metadata
Show full item recordOther Titles
Design of segmental bridge of 385 meters in length by the constructive methodology of free cantilever as a proposed solution to the effects of the phenomenon of “El Niño” over Venados gully in Lancones district, Sulla-PiuraAbstract
A inicios del año 2017 se registró una anomalía sen los efectos climatológicos generados por el Fenómeno del Niño, siendo superior a otros años y generando lluvias extraordinarias a lo largo de la costa peruana con mayor incidencia en la zoma norte. Ello conllevo al aumento de caudal y reactivación de quebradas por donde antes transcurrió un rio, el resultado fue de más de 280 mil damnificados que carecían de ayuda debido a que los caminos y puentes habían sufrido daños que impedían su operatividad al punto de estar colapsados. Posterior al sucedido se detectaron las causas que llevaron al fallo de las estructuras y se llegó a la conclusión de que no se consideraron los eventos extraordinarios del Fenómeno del Niño, la definición del tipo de estructura no fue el adecuado y los estudios de ingeniería básica no dieron la información adecuada a fin de prever este tipo de problemas. Para el caso de estudio se eligió el puente ubicado en la quebrada Venados en el distrito de Lancones (Sullana-Piura), donde la estructura de 60 metros de longitud fue excedida hidráulicamente debido a que el caudal cubrió un área mucho mayor a la cubierta por el puente. Se aborda el caso proponiendo un puente construido por la metodología de dovelas sucesivas, con dos pilares oblongos huecos y dos estribos; además de efectuarse el calculo hidrológico para diseñar enrocados como protección de riberas.At the beginning of the year 2017, an anomaly was registered without the climatological effects generated by the “El Niño” Phenomenon, being higher than in other years and generating extraordinary rains along the Peruvian coast with the highest incidence in the northern area. This led to the increase in flow and reactivation of streams where a river previously passed, the result was more than 280 thousand victims who lacked help because the roads and bridges had suffered damages that prevented their operation to the point of being collapsed. After the event, the causes that led to the failure of the structures were detected and it was concluded that the extraordinary events of the El Niño phenomenon were not considered, the definition of the type of structure was not adequate and the basic engineering studies were not they gave the appropriate information in order to foresee these kinds of problems. For the case study, the bridge located in the Venados gully in the Lancones district (Sullana-Piura) was chosen, where the 60-meter-long structure was hydraulically exceeded because the flow covered a much larger area than the one covered by the bridge. The case is approached proposing a bridge built by the methodology of successive segments, with two oblong hollow pillars and two abutments; in addition to carrying out the hydrological calculation to design rocky as protection of banks.
Type
info:eu-repo/semantics/bachelorThesisRights
info:eu-repo/semantics/openAccessAttribution-NonCommercial-ShareAlike 4.0 International
Language
spaCollections
The following license files are associated with this item:
- Creative Commons