Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Issue Date
2020-02-28
Metadata
Show full item recordPublisher
Institute of Physics PublishingJournal
IOP Conference Series: Materials Science and EngineeringDOI
10.1088/1757-899X/758/1/012042Additional Links
https://iopscience.iop.org/article/10.1088/1757-899X/758/1/012042Abstract
The tower crane is an electromechanical equipment that is used for the vertical transport of materials in a construction project and together with the two riggers form the work team to carry out this task. One of the main problems in the construction of multifamily buildings corresponds to the use of the tower crane because vertical transport causes non-contributory times, which is, dead times and waits above expectations. This research analyzes the current vertical transport process and proposes its optimization through some management tools with the aim of improving the productivity of the use of the tower crane by reducing non-contributory times. To this end, the productivity of the work team is recorded in several projects with similar characteristics, then the main problems are selected to analyze them and finally the process is optimized. The results determined that non-contributory times can be reduced by 10% if there is an orderly and continuous process.Type
info:eu-repo/semantics/articleRights
info:eu-repo/semantics/openAccessAttribution-NonCommercial-ShareAlike 4.0 International
Language
engSeries/Report no.
1ISSN
17578981ae974a485f413a2113503eed53cd6c53
10.1088/1757-899X/758/1/012042
Scopus Count
Collections
The following license files are associated with this item:
- Creative Commons