Show simple item record

dc.contributor.advisorGutiérrez Lazarte, Frederick Michell
dc.contributor.authorChávez Ñaupari, Fernando Pros`t Deninson*
dc.contributor.authorToledo Pineda, Julio Alfredo*
dc.date.accessioned2019-02-25T02:00:13Z
dc.date.available2019-02-25T02:00:13Z
dc.date.issued2018-11-15
dc.identifier.citation[1] F. P. D. Chávez Ñaupari and J. A. Toledo Pineda, “Optimización del planeamiento y control de un proyecto inmobiliario, a través de LPS y un modelo BIM para el secuenciamiento e identificación de restricciones,” Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Perú, 2018. doi: https://doi.org/10.19083/tesis/625159
dc.identifier.doi10.19083/tesis/625159
dc.identifier.urihttp://hdl.handle.net/10757/625159
dc.description.abstractMediante el presente trabajo se demuestra la viabilidad de poder integrar la metodología Lean Construction, a través de su principal herramienta (el Last Planner), con el BIM (Building Information Modeling) generando una mejora de productividad enfocada a las etapas de diseño y construcción de un proyecto inmobiliario. La integración se resume en el soporte tecnológico de los modelos virtuales desarrollados por el BIM en conjunto con la manera como se trabaja la información brindando un soporte efectivo y que suma valor a los procesos ejecutados por el Last Planner. A través de un análisis de interferencias e incompatibilidades que pueden ser consideradas como restricciones de obra, al ejecutarse la planificación del avance, se pudo determinar una liberación de restricciones no identificadas que podrían ser considerables a la hora de ejecutar el proyecto y que no se hubieran detectado de manera temprana trayendo consigo retrasos. Además, se tiene un soporte visual de lo ejecutado y de lo planificado, en conjunto con la posibilidad de dar soluciones a problemas de constructabilidad del proyecto. Se considera un ahorro en trabajos rehechos a través de la integración de ambos elementos y se traduce en una mejora de PPC y de SPI, demostrando que tanto en planeamiento como en el control del proyecto se puede optimizar la productividad con el análisis descrito.en_US
dc.description.abstractThrough this work we demonstrate the feasibility of being able to integrate the Lean Construction methodology, through its main tool (the Last Planner), with the BIM (Building Information Modeling), generating an improvement in productivity focused on the design and construction stages of a real estate project. The integration is summarized in the technological support of the virtual models developed by the BIM together with the way in which the information is worked providing an effective support that adds value to the processes executed by the Last Planner. Through an analysis of interferences and incompatibilities that can be considered as work restrictions, when executing the progress planning, it was possible to determine a release of unidentified restrictions that could be considerable at the time of executing the project and that would not have been detected early, bringing with it delays. In addition, there is a visual support of the executed and the planned, together with the possibility of giving solutions to problems of constructability of the project. It is considered a saving in reworked works through the integration of both elements and results in an improvement of PPC and SPI, demonstrating that both in planning and in the control of the project, productivity can be optimized with the analysis described.en_US
dc.description.uriTesises_PE
dc.formatapplication/pdfen_US
dc.formatapplication/epuben_US
dc.formatapplication/msworden_US
dc.language.isospaen_US
dc.publisherUniversidad Peruana de Ciencias Aplicadas (UPC)en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rightsAttribution-NonCommercial-ShareAlike 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Peruana de Ciencias Aplicadas (UPC)es_PE
dc.sourceRepositorio Académico - UPCes_PE
dc.subjectGestión de la construcciónen_US
dc.subjectProyectos de construcciónen_US
dc.subjectProductividaden_US
dc.subjectAdministración de procesosen_US
dc.subjectIngeniería Civilen_US
dc.titleOptimización del planeamiento y control de un proyecto inmobiliario, a través de LPS y un modelo BIM para el secuenciamiento e identificación de restriccionesen_US
dc.title.alternativeOptimization of the planning and control of a real estate project, through LPS and a BIM model for the sequencing and identification of restrictionsen_US
dc.typeinfo:eu-repo/semantics/bachelorThesisen_US
thesis.degree.grantorUniversidad Peruana de Ciencias Aplicadas (UPC). Facultad de ingenieríaes_PE
thesis.degree.levelLicenciaturaes_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
refterms.dateFOA2019-02-25T02:00:14Z
dc.identifier.isni0000 0001 2196 144X
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales_PE
dc.publisher.countryPEes_PE
dc.type.otherTesises_PE


Files in this item

Thumbnail
Name:
Toledo_PJ.pdf
Size:
7.043Mb
Format:
PDF
Thumbnail
Name:
Toledo_PJ_Ficha.pdf
Embargo:
2088-11-15
Size:
132.2Kb
Format:
PDF
Thumbnail
Name:
Toledo_PJ.docx
Embargo:
2088-11-15
Size:
17.18Mb
Format:
Microsoft Word 2007

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess