Improvement of the polymer insulation production process using lean manufacturing tools and plant layout design
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Fecha de publicación
2021-01-01Palabras clave
5S’sLayout
Lean
Lean Manufacturing
Polymeric insulator
Production capacity
Value Stream Mapping
Metadatos
Mostrar el registro completo del ítemEditorial
SpringerJournal
Advances in Intelligent Systems and ComputingDOI
10.1007/978-3-030-55307-4_87Enlaces adicionales
https://link.springer.com/chapter/10.1007/978-3-030-55307-4_87Resumen
This study focuses on problems of inadequate production capacity management. The factors that generate this scenario are related to the incorrect distribution of work areas, the absence of standardization of the production process and unorganized workstations in the production line. The application of 5S’s tool, Value Stream Mapping (VSM) and a proposal for plant design are presented to solve the problem. After the application of the design solution, it was identified that 1 h and 23 min can be saved in transfer times, which can be invested in the manufacture of more products, improving the use of the plant’s capacity.Tipo
info:eu-repo/semantics/articleDerechos
info:eu-repo/semantics/embargoedAccessIdioma
engDescripción
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado.ISSN
21945357EISSN
21945365ae974a485f413a2113503eed53cd6c53
10.1007/978-3-030-55307-4_87
Scopus Count
Colecciones